Alcan Gove Thrid Stage Expansion-G3 Project, Australia

Piping Fabrication

 

 

.

 

.

 

.

Project form 2005 to 2007, ICS has done 20,000t structural steel shop detail drawings and generated 10,000 Isometric drawings, and also provided the project control system to monitor the fabrication & assembly work progress including raw material tracking.

 

 

 

 

Leave a Reply

Your email address will not be published. Required fields are marked *