Modular Building Office Project

Modular Building Office Project

    Fabricate, transport and installation for the modular building eq: Site office, swimming pool, public toilet, etc; designed by ICSSDP.          

Read more »

PTT Midline 4th Transition Tie-in Project

PTT Midline 4th Transition Tie-in Project

    There are more than 2,000 DBI of 42″ pipe were fabricated, painted and installed.  

Read more »

PTT Pipeline  Korach Project

PTT Pipeline  Korach Project

    There are total more than 2,000 tons of steel trench boxes were fabricated.      

Read more »

SNC – Benina International Airport Project, India

SNC – Benina International Airport Project, India

    Project from 2010 to 2011, ICS has 85% done 10,000t structural steel 3D model and shop detail drawings including joint connection design, unfortunately the project was cancelled later on after the project was started for 5 months as the civil war in Libya.        

Read more »

Roy Hill Project, Australia_3D Model

Roy Hill Project, Australia_3D Model

Piping Fabrication     .   .   . Project from 2014 to 2015, ICS has 85% done 10,000t structural steel 3D model and shop detail drawings.          

Read more »

Eqypt EBIC 2000MTPD KAAP  Ammonia Plant Project, Eqypt

Eqypt EBIC 2000MTPD KAAP  Ammonia Plant Project, Eqypt

Piping Fabrication     .   .   . Ammonia Plant Project from 2006 to 2007; ICS has generated approx. 3,000 Isometric drawings, and also provided the project control system to monitor the pipe spool fabrication & installation work onsite in Egypt.    

Read more »

Alcan Gove Thrid Stage Expansion-G3 Project, Australia

Alcan Gove Thrid Stage Expansion-G3 Project, Australia

Piping Fabrication     .   .   . Project form 2005 to 2007, ICS has done 20,000t structural steel shop detail drawings and generated 10,000 Isometric drawings, and also provided the project control system to monitor the fabrication & assembly work progress including raw material tracking.        