Project from 2010 to 2011, ICS has 85% done 10,000t structural steel 3D model and shop detail drawings including joint connection design, unfortunately the project was cancelled later on after the project was started for 5 months as the civil war in Libya.
Piping Fabrication . . . Project from 2014 to 2015, ICS has 85% done 10,000t structural steel 3D model and shop detail drawings.
Piping Fabrication . . . Ammonia Plant Project from 2006 to 2007; ICS has generated approx. 3,000 Isometric drawings, and also provided the project control system to monitor the pipe spool fabrication & installation work onsite in Egypt.
Piping Fabrication . . . Project form 2005 to 2007, ICS has done 20,000t structural steel shop detail drawings and generated 10,000 Isometric drawings, and also provided the project control system to monitor the fabrication & assembly work progress including raw material tracking.